Sauna steam engine
Item No.: | ACW-360 |
Supplier Details
Country: Taiwan
State: Taiwan
City: Taoyuan
Address: No.18 Lane 152 Two Section Renhe Rd.,Daxi Town
TEL: +886-3-3808277
Fax: +886-3-3808272

Online Showroom:
22 Products
Sauna steam engineCode for construction and site construction notes一、product: Kang Li steam engine1. specifications:Maximum space capacity using voltage wire current4KW220V1.7m35.5 mm218A6KW3.8 m38 mm228A8KW7.0 m336A2. dimension: high 170x 360x 320mm.3. water intake and production of copper plated ball valve switches, and 2 high pressure, inlet water connected to the water into the steam engine.4. power wiring to 7mm power cable connects to the steam engine power.5. steam engine steam outlet for stainless steel 4 snake pipe connected to a steam inlet.6. site admitted intake, steaming air intake, drains, usually 4 in charge.Second, install:1. power cord: power wiring to 8mm wire configurations, and switch box configuration earth leakage circuit breaker 40A Fuse switch-free and independent of.2. time controller: laying two prior groups-linking Interworking between junction box and the steam engine, timing controller and distribution on steam, a gold configuration for 120~150cm distance to Earth type use vertical.3. configure the environment: such as configured in the ceiling, allow high above 35cm space. When on the spot-environment configuration, production of suspended or placed.4. steam engine installation: next to a steam engine installed, prior-buried 4 between steam and stainless steel tubes. Make smooth steam from steam discharges. Steam discharge on the ground above 10cm~20cm, embedded 4 teeth. Prior buried water supply source.Third, the installation notes:1. make sure earth leakage circuit breaker current value for more than 50A.2. If the extensions are used for the steam engine power, determines the current conductor can withstand more than 50A, against wire and fire.3. place the steam engine in a well ventilated place, avoid excessive humidity causes leakage, or computer Board mouldy, reduced the service life of the steam engine.4. the need to set aside maintenance port in order to facilitate future maintenance operations. 5. install configurations such as drawings:Four, the steam engine description method of control panel:1. determine before you use all the power and steam engine took over the is installed and correctly set2. when first opening the control panel power switch, to re-start the control panel power (cancel sleep device)3. use the arrow keys to adjust the appropriate time (15, 20, 25, 30, 35, 40) minutes in six sets.After you determine the time, press the power switch once again to launch the steam engine,4. fixed red light begins flashing on the Panel, to indicate that the steam engine started actuationFour, the steam engine description method of control panel:1. determine before you use all the power and steam engine took over the is installed and correctly set2. when first opening the control panel power switch, to re-start the control panel power (cancel sleep device)3. use the arrow keys to adjust the appropriate time (15, 20, 25, 30, 35, 40) minutes in six sets.After you determine the time, press the power switch once again to launch the steam engine,4. fixed red light begins flashing on the Panel, to indicate that the steam engine started actuation.