Injection Mold
Item No.: | PM-004 |
Supplier Details
Country: Taiwan
City: New Taipei City 236
Address: 3F., No. 6, Yongping St., Tucheng Dist.
TEL: +886-2-22697237
Fax: +886-2-22697615

Online Showroom:
40 Products
High Precise Particle Measuring Device Mold
PM-004
Three-plate and double injection mold with multi-gates and excellent design of conformal cooling.
Lead Time from Mold Building to Mass Production
Generally, it takes about 20-40 working days. If customers have special needs, we can also fully cooperate to reduce lead time.
The lead time for the different product development stages is as follows:
Building Mold:
It usually takes 20 to 30 working days. The actual mold building time may vary depending on the size of the product and the structure of the mold.
Trial Samples (T1 parts) ready for the customer approval:
After the mold building is completed, it may need testing and adjustment. Then, trial samples will be provided to the customer for approval, and it typically takes 5 working days.
Product Production:
After customer approves the part and places orders, the product can be shipped within 15-20 working days.
If any issues happen during the trial or production and requires mold modification, the final lead time of production will be changed according to the actual situation.
PM-004
Three-plate and double injection mold with multi-gates and excellent design of conformal cooling.
- Development: Mold design and mold injection are according to customers’ CAD; offer free mold trial samples.
- Material: Makrolon 6557. All kinds of engineering plastic are available based on customers’ demands.
- Surface Finish: Texture. Both texture and polishing are available upon request.
- Color: Black. Colors can be customized upon request.
- Mold Base Steel: Select the most suitable P5 steel according to demands.
- Core Material: NAK-80 is the core material. Mold life can reach more than 300,000 shots.
- Demolding Mechanism: Provide solutions to expand life of mechanism actuation.
- Gate Type: Design the best runner system according to product demands.
- Cooling System: Design the best conformal cooling channels according to structure of the product.
- Ejection System: Design the best ejection method according to structure of the product.
Lead Time from Mold Building to Mass Production
Generally, it takes about 20-40 working days. If customers have special needs, we can also fully cooperate to reduce lead time.
The lead time for the different product development stages is as follows:
Building Mold:
It usually takes 20 to 30 working days. The actual mold building time may vary depending on the size of the product and the structure of the mold.
Trial Samples (T1 parts) ready for the customer approval:
After the mold building is completed, it may need testing and adjustment. Then, trial samples will be provided to the customer for approval, and it typically takes 5 working days.
Product Production:
After customer approves the part and places orders, the product can be shipped within 15-20 working days.
If any issues happen during the trial or production and requires mold modification, the final lead time of production will be changed according to the actual situation.